
SETBACK AFTER THE SLAB IS REMOVED FROM THE SLAB
Equipment needed to prevent microcracking in the slab too quickly and unwanted curvatures in the horizontal elements, this equipment stands as a safety line after the concrete has been cast, allowing the highest percentage of slab surfaces to be removed without affecting the structural integrity of the constructed element.

This system allows us to have a support for the slabs, preventing micro-cracks in the concrete when stripping.